This is the production schedule I have made for when I'm going to film and begin editing my music video. On the 5th and 8th of November I will be filming the shots of outdoor scenery in the evening when the sun is setting for the desired effect. I will then be filming in the TV Studio on the 17th and begin editing on the 27th which will give me time to look through the footage and select the parts that I want to include in my final video. If I need to do any re-shoots I should hopefully be able to do them in this time.

No comments:
Post a Comment